Business

Nigerian firm builds compressors to expand Escravos–Lagos gas pipeline flow

Nigerian engineering company Lee Engineering is building two compressor stations in Edo State for the Escravos–Lagos Pipeline System, according to a 22 October statement from the presidency. The stations are intended to increase pressure in the line and allow it to carry more gas.

The pipeline’s design capacity was expanded from 1.1 billion to 2.3 billion standard cubic feet a day, but the presidency says the compressor stations are needed before the system can operate at that higher level. The 2.3 billion figure is a target capacity, rather than a statement of current daily deliveries.

President Bola Tinubu discussed the project during a meeting with Lee Engineering chairman Leemon Ikpea in Abuja. The government expects stronger flows to support power plants and industry along the route and potentially increase supplies through the West African Gas Pipeline.

Tinubu also called for more work for capable Nigerian engineering firms. The presidency said some components are being made at Lee Engineering’s fabrication yard in Warri.

Source: Nigeria’s State House (published 22 October 2026).

Montage Africa

Share
Published by
Montage Africa

Recent Posts

Malaria’s impact goes beyond recovery

ENTEBBE, Uganda, 27 October 2026 -/African Media Agency(AMA)/ - When nine-year-old James Ssemambo developed severe…

58 minutes ago

SAP Empowers AI Developers to Build What Matters and Turn Intent into Autonomous Execution

International Space Station’s use of tabular AI and expanded partnerships demonstrate the art of the…

59 minutes ago

Malaria vaccine price deal could save $50m and widen access

UNICEF says a conditional deal could lower the RTS,S malaria vaccine price by about 40%…

5 hours ago

Zambia’s economy grew 5.2% in 2025, AfDB report says

An African Development Bank report points to faster growth while warning that Zambia still faces…

5 hours ago

South Africa green-skills project maps jobs linked to clean energy

A partnership backed by a $1 million grant is mapping skills demand and planning local…

5 hours ago

AfDB approves $503.75m Botswana loan for energy relief and jobs

The financing is designed to cushion energy costs while supporting Botswana’s private-sector and jobs reforms.

5 hours ago